House and Garage Demolition in Cupertino, CA: Permit Checklist and Fees

By Mateus Lima, owner of Bay Demo, CA License #1055298 · Updated

Quick answer
  • Cupertino requires a demolition permit for any building, structure or pool. The city's sample site plan marks a tool shed and a garage for demolition.
  • The checklist asks for a PG&E letter confirming gas and electric were terminated at the main/street, a BAAQMD letter with an ASB number, a pest control letter and a PCB screening form.
  • Every residential demolition needs a debris management plan through Green Halo.
  • City fee for a home (R-3) up to 3,000 sq ft: $880, plus $306 for each additional 3,000 sq ft (effective July 1, 2026). The city lists 10 days for review.

Cupertino demolition permit at a glance

QuestionWhat the City of Cupertino says
Is a permit required?"Demolition permits are required for all sites where a demolition of any building, structure, and/or pool is proposed."
How to applyComplete a Demolition Permit Application (D). It can be submitted together with the building permit for the new home, but the new building permit is not issued until the demolition permit is.
FeesDue when you submit. Residential (R-3) up to 3,000 sq ft: $880; each additional 3,000 sq ft: $306; residential pool: $589 (Resolution 26-047, effective July 1, 2026).
Review timeThe city lists 10 days for the initial review and 10 days for resubmittals.
Site planOne scaled digital copy showing garages, carports, sheds and pools, and every on-site tree with species and diameter at 4.5 ft above grade.
PG&EA termination letter confirming gas and electric were terminated at the main/street. The checklist says to call PG&E at 408-725-3325 to schedule the disconnect.
Air districtA BAAQMD notification letter with an ASB number (BAAQMD calls it the job number, or J number).
PestsA letter from a pest control contractor stating the site was inspected and is clear of pests.
PCB formA PCB Screening Assessment Form.
DebrisA Construction and Demolition Debris Management Plan through Green Halo for every residential demolition.
Historic checkVerify whether the building is a historic landmark and get clearance from Planning (planning@cupertino.gov).
TreesTree protection is inspected by Public Works (408-777-3354) before the permit is issued.

Source: City of Cupertino: Procedure Checklist for Demolition Permits (PDF, rev. 1/9/26) (opens the official site) · City of Cupertino: Building Fee Schedule (PDF, effective July 1, 2026) (opens the official site) · City of Cupertino: Permits (permit timelines) (opens the official site)

How a Cupertino demolition usually runs

  1. Visit and written price. We check the structures, access, trees and utilities.
  2. PG&E and BAAQMD first. We start both right away. BAAQMD needs notice at least 10 working days before any demolition.
  3. Pest letter and PCB form. Both go in the package.
  4. Tree protection. Installed and inspected by Public Works before the permit is issued.
  5. Application and fees. Application D, site plan and the Green Halo debris plan, with fees paid at submittal.
  6. Demolition, recycling and final. We stay until the city closes the permit.

Review and utility times depend on the city and PG&E, so we confirm the start date once the permit is issued.

Source: City of Cupertino: Procedure Checklist for Demolition Permits (PDF, rev. 1/9/26) (opens the official site) · BAAQMD: Asbestos Demolition and Renovation Notification (opens the official site)

Garages, sheds and pools in Cupertino

Cupertino does not list a size exemption: its sample site plan shows a tool shed and a garage marked for demolition, and pools need a permit too ($589, plus a Cupertino Sewer District permit to drain). See our Cupertino pool removal guide and garage and shed demolition.

Source: City of Cupertino: Procedure Checklist for Demolition Permits (PDF, rev. 1/9/26) (opens the official site) · City of Cupertino: Building Fee Schedule (PDF, effective July 1, 2026) (opens the official site)

Demolition in Cupertino: common questions

How much is a demolition permit in Cupertino?

For a home (R-3) up to 3,000 sq ft the city fee is $880, plus $306 for each additional 3,000 sq ft, in the fee schedule effective July 1, 2026. Fees are due at submittal.

Do I need a permit to tear down a shed in Cupertino?

Yes. Cupertino requires a demolition permit for any building, structure or pool, and its sample site plan includes a tool shed.

What is the ASB number for a Cupertino demolition?

It is the number on the BAAQMD notification letter (BAAQMD calls it the job number or J number). Cupertino asks for that letter with the demolition permit.

How long does Cupertino take to review a demolition permit?

The city lists 10 days for the initial review and 10 days for each resubmittal.

Keep reading

Official sources

Mateus Lima, owner of Bay Demo Mateus LimaOwner, Bay Demo · CA Lic. #1055298 5.0 on Google

Step 1 of 2

When do you want to start?
Hi, I'm Mateus. When would you like to start?I book on-site estimates in the order requests come in.
House Demolition ·
Great. Where's the project, and how can I reach you?Last step.
Please enter your name.
Please enter a valid 10-digit phone number.
So Mateus can check the property and permits before the visit. Please enter the project address.
Please enter a valid email.

★★★★★ Matt, the owner, came promptly to look at the work and was able to give me a quote on the spot. Varun Varma, Google review

You talk to the owner, not a call center.

Prefer to talk? Call (510) 953-4477
Call Now Get My Price